CanaCore coordinates verified drafting specialists to prepare building permit drawings and complete application packages — code-compliant plans, municipal submission, and plan-review responses — with CanaCore managing the process from application through the review process.

What Are Building Permits?

Building permits are official approvals from local authorities that authorize construction, renovation, or structural work to proceed. They ensure projects comply with building codes, zoning regulations, and safety standards that protect occupants and neighboring properties. Obtaining permits involves submitting detailed plans, paying application fees, undergoing plan review, and scheduling inspections. The process varies by municipality but typically takes 2-8 weeks depending on project complexity and local workload.

2-8 weeks
Typical Approval Time
100%
Code Compliant
Fast Approvals
Fast Approvals

Expert municipal coordination

Permit Types We Handle

Professional permit coordination for all construction types

New Home Construction

New Home Construction

Complete permit packages for ground-up residential construction projects.

Home Additions & Renovations

Home Additions & Renovations

Permit applications for room additions, second stories, and major remodels.

Commercial Buildings

Commercial Buildings

Permit coordination for retail, office, and mixed-use commercial projects.

Structural Modifications

Structural Modifications

Permits for load-bearing wall removal, beam installations, and foundation work.

Accessory Structures

Accessory Structures

Permit applications for garages, sheds, carports, and backyard buildings.

Mechanical & Electrical

Mechanical & Electrical

Permits for HVAC installations, electrical upgrades, and plumbing modifications.

Our Step-by-Step Process

From application preparation to final approval and inspections

01

Document Review

1-2 days

Review architectural drawings, structural plans, and specifications to ensure completeness and code compliance.

02

Code Compliance Check

2-3 days

Verify all plans meet National Building Code, local bylaws, zoning regulations, and fire code requirements.

03

Application Preparation

2-3 days

Complete permit application forms, assemble required documents, and prepare submission package.

04

Permit Submission

1 day

Submit complete application to municipal building department with all required drawings and fees.

05

Review Coordination

1-4 weeks

Respond to plan examiner comments, address deficiencies, and coordinate with municipal staff.

06

Permit Issuance

1-2 days

Obtain approved permits and ensure all conditions are understood for construction start.

07

Inspection Coordination

Ongoing

Schedule and coordinate required inspections throughout construction until final occupancy approval.

Our Permit Coordination Tools

Professional systems and relationships for efficient permit processing

Municipal Portal Access

Direct submission to building departments

Code Reference Software

Building code compliance verification

Permit Tracking System

Application status monitoring

Document Management

Organized submission packages

Municipal Relationships

Direct communication with plan examiners

Inspection Scheduling

Coordinated inspection booking

PROFESSIONAL QUALITY

Compliance & Requirements

Every permit meets all regulatory and documentation standards

Regulatory Compliance

  • National Building Code adherence
  • Provincial building regulations
  • Municipal zoning bylaws
  • Fire code requirements

Documentation Standards

  • Complete stamped drawings
  • Energy efficiency compliance
  • Site plans and surveys
  • Professional engineer certifications

Professional Service

  • Experienced permit coordinators
  • Direct municipal communication
  • Deficiency resolution support
  • CanaCore project management

Dealing with city permits can be intimidating, but CanaCore handled everything. They prepared our complete permit package, submitted it electronically, responded to all the city's questions, and got our permit approved in three weeks. Their expertise saved us months of frustration!

Patricia & Brian S.
Edmonton, AB • Kitchen Renovation

Ready to Get Your Building Permit?

Get a free permit consultation and timeline estimate. CanaCore's experienced coordinators handle all municipal requirements and expedite your approval.

Free
Consultation
Fast
Approvals
Expert
Coordination

Common questions

Which renovations need a building permit?

Generally structural changes, new or relocated plumbing and electrical, additions, decks above a certain height, and finishing a basement. Cosmetic work in the same layout often does not. The specific answer depends on your municipality and the scope of the job.

What is needed to apply for a permit?

Drawings showing the existing conditions and the proposed work, with engineering where the change is structural. Those are prepared for permit review, and the municipality then does its own plan examination — which is a separate wait on top of the drawing time.

How long does the permit process take?

It varies by municipality and by how complete the submission is, since incomplete drawings get sent back and restart the clock. We coordinate the drawing package and the submission to reduce back-and-forth, but the plan-review timeline itself is set by the city.