
Renovation Drawings & Home Addition Plans
Permit-Ready Renovation Drawings & Addition Plans
CanaCore coordinates verified drafting specialists to produce renovation drawings and home addition plans — code-compliant floor plans, sections, and details prepared for municipal permit review, from kitchen remodels and basement finishes to second-storey additions.
What Are Renovation Permit Drawings?
Renovation permit drawings are technical documents showing proposed changes to existing structures. Unlike new construction plans, renovation drawings must clearly indicate what's existing versus what's new, demonstrate code compliance for modified areas, and show how changes integrate with the original building. Most municipalities require permits for kitchen and bathroom remodels, structural changes, basement finishing, and any work affecting plumbing, electrical, or HVAC systems. Our drawings ensure your renovation meets all code requirements for safe, legal construction.

All renovations meet building standards
Renovation Types We Cover
Permit-ready drawings for every type of home renovation

Kitchen Renovations
Permit drawings for layout changes, new cabinets, plumbing, and electrical modifications.

Bathroom Remodels
Complete permit packages for fixture relocations, tile work, and ventilation upgrades.

Basement Finishing
Code-compliant drawings for new living spaces, bedrooms, and egress requirements.

Structural Modifications
Engineered drawings for wall removal, beam installations, and support systems.

Window & Door Replacements
Drawings for opening modifications, egress compliance, and header sizing.

Attic Conversions
Full permit sets for new living space with stairs, insulation, and height requirements.
Our Step-by-Step Process
From renovation concept to permit-ready drawings
Renovation Scope Review
1-2 hoursDiscuss renovation plans, review existing conditions, and determine permit requirements for your municipality.
As-Built Documentation
1-2 daysMeasure existing conditions or review available floor plans to establish accurate baseline.
Design & Layout Plans
3-5 daysCreate proposed floor plans showing new layouts, fixtures, and modifications.
Technical Details
2-3 daysDevelop sections, elevations, and construction details required for permit approval.
Code Compliance Check
1-2 daysVerify all designs meet building code, fire code, and accessibility requirements.
Engineering Coordination
3-5 daysCoordinate with structural engineer if load-bearing changes or additions require stamping.
Permit Package Delivery
1 dayDeliver complete, stamped drawings ready for municipal submission and approval.
Code Compliance & Standards
Every renovation drawing meets building code and municipal requirements
Building Code Compliance
- National Building Code adherence
- Fire separation requirements
- Egress window specifications
- Stairway and guardrail standards
Technical Requirements
- Structural load calculations
- Plumbing and drainage plans
- Electrical panel and circuit layouts
- HVAC and ventilation sizing
Professional Delivery
- Stamped by licensed professionals
- Complete specification schedules
- Municipal-specific formatting
- CanaCore permit coordination support
Related Services
Complete your project with these complementary design services
Ready for Renovation Permit Drawings?
Get a free consultation and project assessment. CanaCore's designers create code-compliant renovation drawings that get approved fast.
Common questions
How do you keep a renovation project on schedule?
By sequencing the work around the inspection hold points and the long-lead items, and by coordinating the verified, field-supervised trades so one stage is ready when the last finishes. Most delays come from supply and from surprises found on opening up, not from labour.
What is included when CanaCore manages a renovation?
CanaCore coordinates the verified contractors, sequences the trades and supervises the work in the field, and organizes the drawings for permit review where the scope needs them. The company organizes and oversees the project rather than performing the trades itself.
What happens if the scope changes partway through?
Opening up walls or floors can reveal conditions the plan did not show, and additions to scope happen. Each change is priced and, where structural, engineered before it proceeds, so the budget and schedule stay tied to what is actually being built.
Read before you start
Practical guidance from the CanaCore Guide on this type of work.
- What Inspections Are Required During a Renovation?What inspections are required during an Ontario renovation? Building, framing, plumbing, HVAC, electrical rough-in, and final inspection stages explained.
- How to Prepare Your Home Before Construction StartsHow to prepare your home before construction starts—protect belongings, plan access, set site rules, utilities, and safety for Ontario renovations.
- Common Reasons Construction Projects Go Over BudgetCommon reasons renovations go over budget in Ontario—scope creep, hidden conditions, change orders, and bidding gaps—and how to stay on track.
- How Construction Permits Work in Ontario (Step-by-Step)How construction permits work in Ontario—drawings, submission, review, inspections, and occupancy. A clear step-by-step guide for homeowners.
