CanaCore
LANDSCAPING SPECIALTY

Interlocking Driveway & Walkway Installation

Interlocking Paver Driveways & Walkways Built to Last

CanaCore coordinates verified paving crews to install interlocking paver driveways and walkways — proper base preparation, grading for drainage, and edge restraints, with CanaCore field supervision from excavation through the finished surface.

Professional Driveway & Walkway Installation

A well-built driveway or walkway combines function and beauty. Professional installation ensures proper drainage, stable base, quality materials, and techniques that prevent cracking, settling, or premature failure. Whether you choose asphalt, concrete, or interlocking stone, our experienced crews excavate to proper depth, install compacted base, ensure correct slope for drainage, and finish with quality materials for decades of service.

3-7 days
Typical Project
20+ years
Lifespan
Durable Paving
Durable Paving

Professional installation

Paving Services

Professional installation for every paving need

Asphalt Driveways

Asphalt Driveways

Durable asphalt paving for residential and commercial driveways.

Concrete Driveways

Concrete Driveways

Long-lasting concrete driveways with smooth or decorative finishes.

Interlocking Driveways

Interlocking Driveways

Beautiful interlocking stone driveways in various patterns and colors.

Front Walkways

Front Walkways

Inviting pathways from sidewalk to front entrance.

Garden Paths

Garden Paths

Charming walkways through gardens and landscaped areas.

Paver Walkways

Paver Walkways

Decorative paver pathways with professional edging and base.

Our Installation Process

From excavation to finished paving

01

Site Assessment

1-2 hours

Evaluate drainage, slope, soil conditions, and plan optimal layout.

02

Excavation & Grading

1-2 days

Excavate to proper depth, establish drainage slope, and compact subgrade.

03

Base Installation

1 day

Install and compact gravel base for stable, long-lasting foundation.

04

Edge Restraints

1 day

Install edge restraints or forms to contain paving material.

05

Surface Installation

1-2 days

Pour concrete, lay asphalt, or install pavers with proper techniques.

06

Finishing & Sealing

1 day

Finish surface, install edging, apply sealant, and final cleanup.

Professional Equipment

Heavy machinery for quality paving installation

Excavators

Site excavation and grading

Compactors

Base and subgrade compaction

Concrete Mixers

Fresh concrete delivery

Paving Equipment

Professional asphalt or concrete laying

Edge Tools

Clean borders and restraints

Finishing Tools

Smooth, professional surface

QUALITY INSTALLATION

Quality & Durability Standards

Professional paving built to last

Quality Materials

  • Premium paving materials
  • Proper base specifications
  • Quality edge restraints
  • Professional-grade sealants

Expert Installation

  • Proper drainage design
  • Correct base compaction
  • Industry-standard techniques
  • Warranty on workmanship

Professional Service

  • Verified contractors
  • Experienced crews
  • Complete site cleanup
  • CanaCore quality inspection

CanaCore installed our new asphalt driveway and it looks fantastic. They excavated the old concrete, installed proper base, ensured good drainage slope, and laid smooth asphalt. Three years later, it still looks perfect. Professional crew, fair price, quality work!

James & Patricia L.
Burlington, ON • Asphalt Driveway

Ready for a New Driveway or Walkway?

Get a free quote for your paving project. CanaCore delivers professional installation with quality materials and expert craftsmanship.

Free
Estimate
Quality
Materials
Warranty
Included

Common questions

What is the most important part of building a driveway or walkway?

The base. A properly compacted granular base with drainage is what keeps pavers or concrete from settling, heaving and cracking through freeze-thaw cycles, so most of the value is in the ground preparation you cannot see once it is finished.

Why do driveways and walkways heave or crack in winter?

Water trapped under the surface freezes and lifts it — a frost-heave problem, not a surface problem. The fix is base depth, compaction and drainage so water moves away and does not sit under the slab or pavers through the cold months.

How long before a new driveway or walkway can be used?

Interlocking pavers can generally be used soon after they are set and jointed, while poured concrete needs time to cure before it carries weight. The specific wait depends on the material and the weather, and it is confirmed for your job before use.

Interlocking Driveway & Walkway Installation | CanaCore