
Bathroom Renovation & Remodeling Services
Bathroom Renovation Contractors for Remodels, Tiling & Waterproofing
CanaCore coordinates verified bathroom renovation contractors for full remodels, tiling, fixtures, and waterproofing — trades scheduled and field-supervised from layout to final inspection.
What Is a Bathroom Renovation?
A bathroom renovation transforms an outdated or dysfunctional bathroom into a modern, efficient space. From simple fixture updates to complete layout changes with walk-in showers and custom tile, bathroom renovations improve comfort, functionality, and home value. Professional bathroom work requires waterproofing expertise, skilled tile installation, plumbing and electrical knowledge, and attention to moisture control. CanaCore coordinates licensed trades to deliver leak-free, beautiful bathrooms that last.

Relaxing & functional
Bathroom Renovation Services
Complete bathroom transformation from fixtures to finishes

Full Bathroom Remodel
Complete transformation with new fixtures, tile, vanity, and layout optimization.

Shower & Tub Replacement
Walk-in showers, soaker tubs, and custom tile surrounds with modern fixtures.

Vanity & Countertop Installation
Custom vanities with quartz or granite tops and modern plumbing fixtures.

Bathroom Flooring & Tile
Waterproof tile flooring and wall tiling for showers and tub surrounds.

Powder Room Updates
Small bathroom renovations with space-efficient fixtures and modern finishes.

Accessible Bathroom Conversion
Barrier-free showers, grab bars, and accessibility features for aging in place.
Our Step-by-Step Process
From design approval to your new bathroom
Design & Planning
1-2 weeksMeasure space, select fixtures and finishes, finalize layout and plumbing locations.
Demolition
1-2 daysRemove old fixtures, tile, vanity, and flooring. Protect rest of home from dust.
Plumbing & Electrical
2-3 daysRelocate or update plumbing and electrical to match new layout and fixtures.
Waterproofing & Tile
3-5 daysInstall waterproof membrane, lay floor tile, and complete shower tile work.
Fixture Installation
2-3 daysInstall vanity, toilet, shower/tub, and all plumbing fixtures.
Finishing Touches
1-2 daysPaint, install mirrors, lighting, hardware, and accessories. Final inspection.
Professional Equipment & Expertise
Specialized tools for waterproof, beautiful bathrooms
Tile Saws & Tools
Precision tile cutting and installation
Plumbing Equipment
Professional fixture installation
Waterproofing Systems
Shower pan and membrane application
Grouting & Sealing
Moisture protection finishing
Electrical Tools
Lighting and ventilation installation
Dust Containment
Clean work environment
Quality & Code Compliance
Every bathroom built to prevent leaks and last for decades
Waterproofing Standards
- Proper shower pan installation
- Waterproof membrane systems
- Correct tile slope and drainage
- Quality grout and sealant
Code Compliance
- Plumbing code requirements
- Electrical GFCI protection
- Ventilation standards met
- All permits obtained
Quality Installation
- Verified plumbers and electricians
- Professional tile work
- Manufacturer warranty honored
- CanaCore project oversight
Related Services
Complete your project with these complementary services
“CanaCore renovated both our bathrooms. The tile work is flawless, the walk-in shower is stunning, and everything is completely waterproof. The crew was clean, professional, and worked efficiently. Our bathrooms went from dated to spa-like. We couldn't be more thrilled with the results!”
Ready for a Spa-Like Bathroom?
Get a free design consultation and project estimate. CanaCore manages every detail from concept to waterproof completion.
Common questions
What is the most important part of a bathroom renovation to get right?
Waterproofing behind the tile and proper slope to the drain. It is invisible once finished but it is what keeps water out of the framing below, so the shower pan and membrane details get the most attention before any tile goes up.
Can you move the toilet or shower to a new spot?
Often yes, but relocating fixtures means new drain and vent routing, which depends on what is accessible below the floor and usually needs a permit and inspection. We assess the existing plumbing before committing to a new layout.
How disruptive is a bathroom renovation if it is our only bathroom?
A single-bathroom home is the hardest case, because it is out of use for most of the project. It is worth planning alternative arrangements up front, and we sequence the field work to close the fixture-free window as tightly as the inspections allow.
Read before you start
Practical guidance from the CanaCore Guide on this type of work.
- What Inspections Are Required During a Renovation?What inspections are required during an Ontario renovation? Building, framing, plumbing, HVAC, electrical rough-in, and final inspection stages explained.
- How to Prepare Your Home Before Construction StartsHow to prepare your home before construction starts—protect belongings, plan access, set site rules, utilities, and safety for Ontario renovations.
- Common Reasons Construction Projects Go Over BudgetCommon reasons renovations go over budget in Ontario—scope creep, hidden conditions, change orders, and bidding gaps—and how to stay on track.
- How Construction Permits Work in Ontario (Step-by-Step)How construction permits work in Ontario—drawings, submission, review, inspections, and occupancy. A clear step-by-step guide for homeowners.
