
Kitchen Renovation & Remodeling Services
Kitchen Renovation Contractors for Cabinets, Countertops & Full Remodels
CanaCore coordinates verified kitchen renovation contractors for cabinets, countertops, layout changes, and full remodels — trades scheduled and field-supervised from design to final inspection.
What Is a Kitchen Renovation?
A kitchen renovation transforms your most-used room into a modern, efficient space that matches your lifestyle. From simple cabinet and countertop updates to complete layout reconfigurations, kitchen renovations increase home value, improve functionality, and create a space you'll love spending time in. Professional kitchen renovations require careful planning, skilled trades coordination, quality materials, and attention to countless details. CanaCore manages every aspect—design, permits, demolition, installation, and finishing—for a stress-free transformation.

Functional & beautiful
Kitchen Renovation Services
Complete kitchen transformation from cabinets to countertops

Full Kitchen Remodel
Complete kitchen transformation with new cabinets, countertops, appliances, and layout.

Cabinet Refacing & Replacement
Update or replace kitchen cabinets with modern styles and finishes.

Countertop Installation
Quartz, granite, marble, or butcher block countertops with professional fabrication.

Kitchen Island Addition
Custom islands with seating, storage, and additional prep space.

Backsplash Installation
Tile, glass, or stone backsplashes that protect walls and enhance design.

Kitchen Lighting Upgrades
Recessed lighting, pendants, and under-cabinet lighting for function and ambiance.
Our Step-by-Step Process
From design approval to move-in ready kitchen
Design Consultation
1-2 weeksDiscuss goals, measure space, review layout options, and select materials and finishes.
Demolition & Prep
2-3 daysRemove old cabinets, countertops, and appliances. Prepare walls and floors.
Plumbing & Electrical
2-3 daysRelocate or upgrade plumbing and electrical to match new layout and appliances.
Cabinet Installation
2-3 daysInstall new cabinets with precision leveling and secure fastening.
Countertops & Backsplash
3-5 daysTemplate, fabricate, and install countertops. Install tile backsplash.
Finishing Touches
2-3 daysInstall appliances, fixtures, lighting, hardware, and trim. Final inspection.
Professional Equipment & Expertise
Specialized tools for complete kitchen renovations
Cabinet Installation Tools
Precise leveling and mounting
Countertop Fabrication
Custom cutting and edge finishing
Tile Saws & Tools
Professional backsplash installation
Plumbing & Electrical
Code-compliant utility work
Finishing Equipment
Trim, caulking, and hardware
Dust Containment
Clean renovation environment
Design & Quality Standards
Every kitchen built to the highest standards
Design Excellence
- Functional layout optimization
- Material and finish coordination
- Lighting design integration
- Storage maximization
Code Compliance
- Electrical code requirements
- Plumbing regulations met
- Ventilation standards
- All permits obtained
Quality Installation
- Verified trade contractors
- Manufacturer warranties honored
- Precision cabinet installation
- CanaCore project oversight
Related Services
Complete your project with these complementary services
“CanaCore completely transformed our outdated kitchen. The design process was collaborative, the trades were all coordinated seamlessly, and the quality of work is outstanding. Our new quartz countertops, custom cabinets, and tile backsplash look like something from a magazine. We love cooking in here now!”
Ready for Your Dream Kitchen?
Get a free design consultation and project estimate. CanaCore manages every detail from concept to completion.
Common questions
How long is a kitchen usually out of service during a renovation?
Plan for several weeks without a working kitchen. The sequence — demolition, plumbing and electrical rough-in, inspection, drywall, cabinets, countertop templating and install, then backsplash and appliances — cannot be rushed, and countertop and cabinet lead times often set the real end date.
Do I need a permit to renovate my kitchen?
A cosmetic refresh in the same layout often does not, but moving plumbing or electrical, relocating a gas line, or taking out a wall usually does. Where structural or serviced work is involved, drawings are prepared for permit review before the trades begin.
Should I order cabinets and countertops before demolition?
Cabinets should be ordered early because they drive the schedule, but stone countertops are templated off the installed cabinets, not before. We coordinate the ordering so long-lead items are moving while the rough work is underway.
Read before you start
Practical guidance from the CanaCore Guide on this type of work.
- What Inspections Are Required During a Renovation?What inspections are required during an Ontario renovation? Building, framing, plumbing, HVAC, electrical rough-in, and final inspection stages explained.
- How to Prepare Your Home Before Construction StartsHow to prepare your home before construction starts—protect belongings, plan access, set site rules, utilities, and safety for Ontario renovations.
- Common Reasons Construction Projects Go Over BudgetCommon reasons renovations go over budget in Ontario—scope creep, hidden conditions, change orders, and bidding gaps—and how to stay on track.
- How Construction Permits Work in Ontario (Step-by-Step)How construction permits work in Ontario—drawings, submission, review, inspections, and occupancy. A clear step-by-step guide for homeowners.
